• How to Pay
    $0 In Sewer Fees
  • Chemical-Free
    Cooling Tower Solution
  • The 20 Year
    Cooling Tower Upgrade
  • Contact
    Us
Menu
  • How to Pay
    $0 In Sewer Fees
  • Chemical-Free
    Cooling Tower Solution
  • The 20 Year
    Cooling Tower Upgrade
  • Contact
    Us
  • How to Pay $0 In Sewer Fees
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
Menu
  • How to Pay $0 In Sewer Fees
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
UPGRADE TODAY

THE 20-YEAR COOLING TOWER UPGRADE

HOW TO MAXIMIZE
THE USABLE LIFE OF YOUR COOLING TOWER.

Cooling towers are a vital yet costly component for commercial and industrial properties. With some cooling towers costing upwards of $500,000, maximizing the usable life of these units is the best way to ensure you are optimizing value for each dollar spent.  By installing a Hydroplex system at your cooling tower, you are effectively doubling—or potentially tripling—its usable life. This allows you to defer replacement costs for a new tower by at least 10 years, ensuring that you are getting as much use out of your tower as possible.

To put it another way, if your cooling tower costs $500,000 and lasts for 20 years, this means that it costs you approximately $25,000 per year. If you choose not to install a Hydroplex on your cooling tower and it only lasts for 10 years, this cost jumps to $50,000 per year. By reducing purchase costs and other fees, a Hydroplex system can pay for itself in less than 1 year, making it one of the best investments you can make for your property.

commercial water treatment arizona
Play Video
commercial water treatment arizona

HOW DOES A HYDROPLEX SYSTEM PROLONG THE LIFE OF YOUR COOLING TOWER?

The Hydroplex system utilizes an efficient combination of copper-silver ionization, side stream filtration, scale control, Venturi water jets, a centrifugal pump, and conductivity sensors. These components work together to agitate water, eliminate bacteria, and prevent the formation of scale while removing circulating particulates from the system. This helps to prevent clogged pipes and the erosion of plumbing components such as pumps, seals, controls, and valves, keeping your cooling tower running smoothly and minimizing wear over time.

See Brochure

HYDROPLEX DIAGRAMS & EQUIPMENT

KIND WORDS FROM OUR LOYAL CUSTOMERS

★★★★★ 5/5
Horizon is a manufacturing facility in Cleveland, Ohio. A HydroPlex was installed on the cooling tower the first year, and a Loop treatment system was installed on the process water loop the following year. While the water looked reasonably clean prior to the installation of the treatment systems, after installation the filters needed cleaning every few days due to the previous accumulations of scale and other debris in the customer’s equipment. The water is now clean and bacteria free. The filters now remain in service for several months before requiring any attention. Actual money savings have not been quantified yet, but elimination of all chemicals and increase of efficiency has been substantial.
c
Chip
Horizon Manufacturing
★★★★★ 5/5
The 9 is a twenty nine story office, apartments and hotel in Cleveland. The owners wanted a chemical free, environmentally friendly, money saving water treatment system which would also eliminate Legionella. A HydroPlex was installed on the cooling towers and a Loop System was installed on the hot/chilled water loop. The systems have met all goals. The water is clean, clear and the tower basins did not need the normal extensive clean out at the end of the season. There has been no need for chemical treatments since the installation of the Quantum equipment resulting in considerable money savings each year.
p
Pete
The 9
★★★★★ 5/5
Dan is the director of engineering for Peoria County. The water condition for Peoria is so severe that they changed chemical companies every few years trying to find a solution to the cooling tower/chiller issues. Due to the severity of the water, Quantum offered to install a HydroPlex for one season with the agreement that they would purchase the unit if it provided satisfactory results. The HydroPlex provided the results and Dan had QMS provide him with a proposal for several additional units including both BoilerPlex’s for their boilers and Loops, and HydroPlexes for two other cooling towers. The savings in chemical and maintenance costs exceeded the cost of the HydroPlex in less than two years.
d
Dan O Connell
Peoria County
★★★★★ 5/5
A HydroPlex was installed on a new installation of a cooling tower, and a BoilerPlex was installed in the boiler loop in the spring of 2011. The boiler loop was heavily contaminated with circulating debris and bacteria. Excessive corrosion was occurring. After several weeks of operation, the loop was clean and the bacteria are eliminated. The new tower does not have any evidence of scale or algae formation and the water is clear. The customer has saved tens of thousands of dollars by the treatment units eliminating chemicals and excessive maintenance.
g
Gary Smith
Chase Bank
★★★★★ 5/5
“A BoilerPlex was installed for the boilers and hot water loop. Immediately after installation the BoilerPlex filters needed cleaning at least once each day as the previously existing scale and rust were being dislodged. After several months the system was clean and the filters now only need occasional cleaning to maintain clean clear water. A “Loop System” was installed on the chiller/chilled water loop. After the initial cleaning cycle, the water is now clear with no signs of corrosion or scale. Thousands of dollars have been saved each year in energy costs due to increased efficiency of the HVAC equipment.”
t
Tom “Pappy”
USPS Canton, Ohio
★★★★★ 5/5
“Over the last several decades I have seen a lot of chemical-less systems that have not lived up to the hype and have caused detrimental damage to systems. That is the primary reason that so many in my field are so apprehensive about anything other than chemical systems. About a decade ago I installed systems that saved a lot of water and did not use chemicals. The problem however was that the cooling towers for these systems had be cleaned more frequently to function properly which resulted in more labor hours. It has only been 2 years since installing our HydroPlex but I have never had a cooling tower that is as clean and stays as clean because of its continuous treatment process.”
e
Ed Slye
, Director of Engineering
Plaza Companies
★★★★★ 5/5
Frank maintains the towers which are used both for cooling of the office buildings and the process water loops for the automotive facility. Until the installation of the HydroPlex, the process water system had continuous problems with hard water scale formations. Extensive maintenance was required to remove the scale from the tower tubes. Shortly after the installation of the HydroPlex, the existing scale started falling off. Efficiency of the tower system improved and maintenance and chemical treatments for scale control has been eliminated. Maintenance and chemical costs have been eliminated resulting in thousands of dollars being saved each year.
f
Frank Garcia
Johnson Controls

LEARN HOW TO STOP PAYING SEWER FEES ON YOUR COOLING TOWERS TODAY. GET IN TOUCH.

Contact Us
(480) 463-2211
  • How to Pay $0 In Sewer Fees
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
Menu
  • How to Pay $0 In Sewer Fees
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
  • Phone: (480) 463-2211
  • Address: 6424 E Greenway Pkwy, Suite 100 Scottsdale, AZ 85254

Hydroplex systems offer highly effective 24/7 water treatment to consistently control harmful bacteria, remove particulates, and control scale formation in recirculating water. 

Copyright 2025(©) HYDROPLEX | Website Design by FirstPage Marketing

Menu

  • How to Pay $0 In Sewer Fees
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
Menu
  • How to Pay $0 In Sewer Fees
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
UPGRADE TODAY