• Mechanical
    Contractor
    Training
  • Chemical-Free
    Cooling Tower Solution
  • The 20 Year
    Cooling Tower Upgrade
  • Contact
    Us
Menu
  • Mechanical
    Contractor
    Training
  • Chemical-Free
    Cooling Tower Solution
  • The 20 Year
    Cooling Tower Upgrade
  • Contact
    Us
  • Mechanical Contractor Training
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
Menu
  • Mechanical Contractor Training
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
UPGRADE TODAY

HydroPlex Kit & Course for Cooling Towers

HydroPlex Cooling Tower Water Treatment + Masterclass

HYdroPlex water treatment for cooling towers.
Join the First 25 Certified HydroPlex Installers in Europe & WorldwideLimited Beta Cohort – Closes When 25 Are SoldYou already know chemical programs fail: constant bleed-off, scale in fill, Legionella scares, and costly chemical bills your clients hate.
Now install the proven copper-ionization + magnetic-field system that has kept cooling towers scale-free and Legionella-negative for 10 years in Arizona – with zero chemicals..

Choose Your Path

Option 1 – Masterclass Only

HydroPlex Masterclass Beta Course
$2,497 one-time (First 25 save $1,000 instantly $1,497.)

You get lifetime access to:

  • Complete HydroPlex BOMs and component vendor list 
  • Step-by-step assembly diagrams
  • Cooling-tower side stream filtration design assistance
  • Legionella lab test reports
  • Equipment brochures and value proposition
  • Private Slack group + monthly live troubleshooting calls with John Dorrough
  • Listing on Installer map
BUY NOW

BUY THE MASTERCLASS BETA COURSE AT A DISCOUNT NOW.

Option 2 – Masterclass + Complete HydroPlex 150 System KitEverything above + the full factory kit shipped to you
$16,994 total → Save $1,000 instantly
($2,497 course + $14,497 HydroPlex 150 kit + tax & shipping extra)
The HydroPlex 150 kit includes everything for towers up to 300 tons cooling capacity

  • Pre-assembled ionizer
  • Pre-assembled magnetic field device (50-year warranty)
  • Lakos centrifugal separator
  • Digital bleed and feed controller
  • Conductivity sensor
  • Copper tube and fittings, brass ball valves
  • Start-up electrodes, copper test kit, TDS meter, and assembly instructions and diagrams
  • Palleted and ready for assembly

One cooling tower job pays for the entire package twice over.The HydroPlex is sized on a case by case basis.  This 150 kit is the smallest in the line up.

Buy Now
Why Mechanical Contractors Are Switching to HydroPlex Right Now
  • Scale prevention – proven before/after pipe cuts
  • Documented Legionella lab test reports ZERO colony forming units
  • Zero chemical discharge in blowdown water
  • Clients lock you in for 10–15-year service contracts (monthly service and annual anode replacement)
  • Equipment brochures and sales consulting
Enroll Before the Beta Cohort Closes – Only 25 Spots Worldwide[ ] Masterclass Only – $2,497 → Enroll Now for $1,497
[ ] Masterclass + Full HydroPlex 150 System – $15,994 (save $1,000) → Buy Course + Kit
Both options include:
  • Instant access to Module 1 today
  • 12-month warranty on parts
  • Priority listing on the HydroplexAZ.com contractor locator map
18 of 25 spots already claimed.Questions? DM
@HydroplexA
on X or WhatsApp John directly: +1 4802519031Stop selling chemicals. Start selling permanent solutions.
Secure your spot and your first HydroPlex 150 system today.
  • Mechanical Contractor Training
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
Menu
  • Mechanical Contractor Training
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
  • Phone: (480) 463-2211
  • Address: 6424 E Greenway Pkwy, Suite 100 Scottsdale, AZ 85254

Hydroplex systems offer highly effective 24/7 water treatment to consistently control harmful bacteria, remove particulates, and control scale formation in recirculating water. 

Copyright 2026(©) HYDROPLEX | Website Design by FirstPage Marketing

Menu

  • Mechanical Contractor Training
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
Menu
  • Mechanical Contractor Training
  • Chemical-Free Cooling Tower Solution
  • The 20 Year Cooling Tower Upgrade
  • Contact Us
UPGRADE TODAY